Sunday, 28 March 2010

Semester 2 week 9

Tuesday lecture Regan : The architects office.








This weeks Crit:


Result really is that everything needs redoing
-the layout doesn't work at all.
-exterior geometry doesnt work
- not drawing the existing site accurately nor the surrounding building facades.
Todo:
-redo layout to fill layout along briggate, Decide on some measure of geometry for the exterior. Draw accurately the existing facades on briggate. redraw the siteplan.






discovered images:




Conversation about an impossible library led to finding these images.